Subscription options:


Font Size:
kootenaybridge

Kootenay River Bridge reconstruction underwayPosted: May 23, 2012

The bridge over the Kootenay River located at the 13-km mark on the Palliser Forest Service Road will be under construction starting today (May 22) until about June 29.

Access to the Palliser and Cross River Forest Service Roads will not be possible from Kootenay National Park / Hwy 93/Settlers Road during this time.

The road will be closed and there will be no access over the bridge (pictured above). Alternate access to the Palliser and Cross River Forest Service Roads will be through Canal Flats.

Access to the following recreation facilities will be via Canal Flats and the Kootenay River Forest Service Road :
Cross River Canyon Recreation Site( Natural Bridge area),
Marvel Pass Recreation Trail,
Assiniboine Lake Recreation Trail,
Assiniboine Provincial Park,
Whiteman Pass Recreation Trail
Height of the Rockies Provincial Park,
Findlay Creek Recreation Site,
Fenwick Lake Recreation Site,
Palliser /Albert Recreation Site
Other sites and trails in the area.

Aina Cernenoks
Recreation Officer, Rocky Mountain District
Ministry of Forests, Lands and Natural Resource Operations 

Tags:
Author:

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>


More Stories

LetToEd3

Undue stress caused by undelivered promise

> Read More
KC Lead

Iron-ons suck…

> Read More
cfuw30thbazaarAdv

30th Artisan Bazaar ready for Nov. 8

> Read More
WineFestival

Lucky 13 for EK Wine Festival

> Read More
SBM

Successful small business is within reach

> Read More
BRLead

Kellerman capable; Deception an easy read

> Read More
ruckusduo

Ruckus Duo playing Knox tonight

> Read More
JRnJaybirds

John Reischman & The Jaybirds at Key City tonight

> Read More