Home »

New valve pipe operating and moving water
Wattsville Road to remain closed to traffic for another day
Crews contracted by the City of Cranbrook successfully installed a valve pipe Monday (July 7) across Wattsville Road to help move water from Elizabeth Lake.
The 12-inch pipe is now open and is moving water, taking over from the siphon system put in place last week.
The valve pipe will be left at a minimum flow overnight Monday so not to overwhelm the drainage system and cause any downstream flooding. City staff will spend the next few days modifying pipe output and downstream drainage levels to an acceptable level.
Residents and drivers are advised Wattsville Road will remain closed to all traffic for another day. Crews will finish backfilling and repairing the road and conduct clean up through the day Tuesday.
City of Cranbrook