Desktop – Leaderboard

Home » Road repair work planned for Industrial Road 2

Posted: October 30, 2025

Road repair work planned for Industrial Road 2

Terus Construction will be completing road repair work in Cranbrook on Industrial Road 2 between 6th Street NW and Industrial Road C, starting late this week or early next.

The project will involve milling out damaged asphalt joints and patch paving two half metre wide strips — one in each driving lane—to remove and replace the destroyed asphalt.

Work is expected to take a couple of days to complete. Traffic will be reduced to single lane alternating during construction.

Drivers are asked to watch for signage, obey traffic control personnel, and use caution while travelling through the work area.

City of Cranbrook


Article Share
Author: